News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Getting Hard Copies of Images
Ways to obtain photos, slides, etc of Chandra images.
Operations CXO Status Report

Friday 30 September 2005 9.00am EDT

During the last week Chandra completed the observing schedule as planned.

A real-time procedure was executed on 29 Sept to perform a routine Electrical Interface Assembly (EIA) Sequencer self-check.

The schedule of targets for next week is shown below and includes an observation of RX J0720.4-3125 as part of a monitoring program.

------------------------------------------
Radiation Belts Oct 2 EGS-1 ACIS-I Oct 3 87GB 1447+4233 ACIS-S Oct 4 TT Ari ACIS-S/HETG cl0216-1747 ACIS-I EGS-2 ACIS-I Radiation Belts Oct 5 EGS-2 ACIS-I Oct 6 TT Ari ACIS-S/HETG EGS-5 ACIS-I Oct 7 3C 442A ACIS-I RGBJ0112+3818 ACIS-S Radiation Belts Oct 8 RX J0720.4-3125 HRC-S/LETG TT Ari ACIS-S/HETG Oct 9 RX J0720.4-3125 HRC-S/LETG

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports