News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Getting Hard Copies of Images
Ways to obtain photos, slides, etc of Chandra images.
Operations CXO Status Report

Friday 5 October 2018 9.00am EDT

During the last week Chandra completed the observing schedule as planned.

A real-time procedure was executed on Oct 3 to perform a routine self-check of the Electrical Interface Assembly (EIA) Sequencer.

Of note this week was the Einstein Fellows Symposium held in Cambridge MA on Oct 2-3. Presentations were made by 24 current Fellows, covering a wide range of topics in observational and theoretical astrophysics research.

The schedule of targets for the next week is shown below, and includes an observation of GS 1354-64, which which was accepted as a Director's Discretionary Time Target of Opportunity on Sep 26 and is coordinated with ATCA, an observation of AT2018gep, which was accepted as a Target of Opportunity on Sep 23 and an observation of IGRJ17591-2342, which was accepted as a Target of Opportunity on Oct 4.



------------------------------------------
        Radiation Belts
        A133filament           ACIS-I
        GS1354-64              ACIS-S       Oct  8
        PSRJ1709-4429          ACIS-I
        MRC0123-226            ACIS-S
        Abell98                ACIS-I       Oct  9
        PSOJ0226+0302          ACIS-S
        Radiation Belts                     Oct 10
        AT2018gep              ACIS-S
        PSRJ1709-4429          ACIS-I
        A133filament           ACIS-I       Oct 11
        PSRJ1709-4429          ACIS-S
        1RXSJ235324.6-125657   ACIS-I
        A133filament           ACIS-I       Oct 12
        Radiation Belts
        PSRJ1709-4429          ACIS-S
        TDE2                   ACIS-S       Oct 13
        PSZ2G149.39-36.84      ACIS-I
        UGC1230                ACIS-S       Oct 14
        LSBCF544-01            ACIS-S
        IGRJ17591-2342         ACIS-S/HETG
        PSRJ1709-4429          ACIS-S
        SDSSJ100402.61+2855    ACIS-S
        Radiation Belts

------------------------------------------

All spacecraft subsystems continued to support nominal operations.