News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal (opens in new window)
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Getting Hard Copies of Images
Ways to obtain photos, slides, etc of Chandra images.
Operations CXO Status Report

Friday 31 August 2018 9.00am EDT

During the last week Chandra completed the observing schedule as planned.

A real-time procedure was executed on Aug 29 to begin the process of recovering from reset of the EPHIN and EPHIN Input/Output unit last week. Actions were taken to ensure that the Major Frame Pulse Revision B patch is loaded, and EPHIN was put into Maintenance mode where the digital and analog (low-voltage) power supplies are on. The high-voltage power supplies will be turned on at a later time.

The schedule of targets for the next week is shown below and includes an observation of Jupiter coordinated with Juno, an observation of GX 13+1 coordinated with VLA, and an observation of GRB 180720B, which was accepted as a Target of Opportunity on Aug 17.



------------------------------------------
Radiation Belts ClGJ002855+174412 ACIS-I 3CR418.0 ACIS-S VHSJ2115-5913 ACIS-S Sep 4 VHSJ2332-5240 ACIS-S J2348-3054 ACIS-S ArLac (19 obs) HRC-S Sep 5 Abell1925 ACIS-I Radiation Belts betaDor ACIS-I Sep 6 GRB180720B ACIS-S Jupiter HRC-I J1435+5435 ACIS-S Sep 7 NGC7212 ACIS-S Abell2146 ACIS-I Radiation Belts Sep 8 Abell2146 ACIS-I UGC06192 ACIS-S Sep 9 Abell2593 ACIS-I UGC416 ACIS-S Perseusr200SW ACIS-I Mrk1018 ACIS-S ArLac (2 obs) HRC-S Sep 10 PROCYON HRC-I Perseusr200W ACIS-I ClGJ010301-023316 ACIS-I Radiation Belts

------------------------------------------

All spacecraft subsystems continued to support nominal operations.

Return to Status Reports