News by Date
News by Category
Solar System
Stars
White Dwarfs
Supernovas
Neutron Stars
Black Holes
Milky Way Galaxy
Normal Galaxies
Quasars
Galaxy Clusters
Cosmology/Deep Field
Miscellaneous
Press Resources
Status Reports
Press Advisories
Image Releases
Release Guidelines
Image Use Policy
NASA TV
Biographies/Interviews
Web Shortcuts
Chandra Blog
RSS Feed
Chronicle
Email Newsletter
News & Noteworthy
Image Use Policy
Questions & Answers
Glossary of Terms
Download Guide
Get Adobe Reader
Chandra @ NASA
Visit the Chandra pages at the NASA portal
Image Use
Image Use Policy & Request Form
Guidelines for utilizing images, applets, movies, and animations featured in this Web Site.
Getting Hard Copies of Images
Ways to obtain photos, slides, etc of Chandra images.
Operations CXO Status Report

Friday 9 September 2005 9.00am EDT

During the last week the observing schedule was interrupted following a high radiation event at 11:44pm EDT on Sept 7 that stopped the daily load and activated the science instrument safing sequence (SCS 107). All actions were nominal and loads will be restarted once radiation levels have dropped sufficiently.

A real-time procedure was completed on Sept 8 to uplink a maneuver-only load to ensure an attitude that will minimize momentum buildup.

The schedule of targets for next week is shown below.

------------------------------------------
Radiation Belts Sep 11 EGS-5 ACIS-I Sep 12 3C 442A ACIS-I EGS-6 ACIS-I Sep 13 XLSSJ022404.0-0413 ACIS-S MACSJ0159.0-3412 ACIS-I Sep 14 Radiation Belts EGS-6 ACIS-I XLSSJ022404.0-0413 ACIS-S Sep 15 EGS-6 ACIS-I Sep 16 Radiation Belts RCS1419+5326 ACIS-S Sep 17 RGB0040+100 ACIS-S Sep 18 NGC1052 ACIS-S

------------------------------------------

All spacecraft subsystems continued to support nominal operations.