Over the weekend Chandra observed a GTO target S-Z Cluster, NGC
4151 and SNR 590.0-68.7 with ACIS-S, and passed through the
radiation belts with the associated ACIS CTI
measurements.
The next mission planning load (Dec 5) was signed off on Friday
and began executing at 4.30pm on Sunday Dec 5.
During the next 48 hours, Chandra will observe RX J1159+5531
with ACIS-I and begin a long observation of the Lockman Hole
with HRC-I. This observation will continue until the pre-belt
ACIS CTI measurement on Tuesday afternoon.
The spacecraft subsystems continued to operate nominally.
|