Operations CXO Status Report
Friday 19 Dec 2003, 9.00am EST
During the last week Chandra completed the observing schedule as
planned.
A real-time procedure was completed on Dec 12 to update the
on-board ephemeris.
Preparations are on track for the completion of
a 2-week mission planning load that will cover the new-year period.
The observing schedule for the next week is shown below and includes
an observation of M31 coordinated withe Hubble Space Telescope.. |
------------------------------------------ Radiation Belts Dec 22
NGC 2362 ACIS-I
RXJ0513.9-6951 HRC-S/LETG Dec 24
E0102-72 ACIS-S
E0102-72 ACIS-S
Radiation Belts
M31 ACIS-I Dec 25
RX J1914.4+2456 ACIS-S
1E 1415.6+2557 HRC-I
HR 5392 ACIS-I Dec 26
MACS911.2+1746 ACIS-I
Mrk 1210 ACIS-S
NGC4697 ACIS-S
ESO 428-G014 ACIS-S Dec 27
Radiation Belts
HH 184 ACIS-I Dec 28
0820+225 ACIS-S
PSR J1210-5226 HRC-I ------------------------------------------
All spacecraft subsystems continued to support nominal operations.