Operations CXO Status Report

Friday 21 Nov 2003, 7.30am EST

During the last week Chandra completed the observing schedule as
planned.

Preparations for the 2003 Leonids meteor shower passage were completed and operations proceeded accordingly last week. Steps were taken to ensure that Chandra was pointed to within 10 degrees of the anti-radiant during the passage of 4 shower streams on Nov 13, 18, 19 and 23.

On Nov 15 telemetry indicated an unexpected disturbance in the spacecraft pointing stability. Preliminary analysis indicates a change in spacecraft rate disturbances and corresponding system momentum consistent with an impact from a Leonid meteoroid. All systems continued to operate normally following the event however analysis is being performed to assess possible undetected damage.

A Chandra press release was issued on Nov 17 describing observations of the quasar GB1508+5714 that reveal a jet of high-energy particles that extends more than 100,000 light years from the supermassive black hole powering the quasar. For details see: http://chandra.harvard.edu/photo/2003/gb1508/

The observing schedule for the next week is shown below and includes a series of 30 observations of Comet Encke (a moving target) and an observation of M31 coordinated with HST.


------------------------------------------
Radiation Belts Nov 23
NGC 5283 ACIS-S
Comet Encke (30 obs) ACIS-S
RX J1914.4+2456 ACIS-S Nov 24
3C273 Jet ACIS-S
1322+36 ACIS-S Nov 25
FTM 0904-0145 ACIS-S
Radiation Belts
zeta Lep ACIS-I Nov 26
PMN J0214-0518 ACIS-S
SDS 2357+0043 ACIS-S
M31 ACIS-I
SDSSJ080154.24+441233.9 ACIS-S
FTM 0915+2418 ACIS-S
4C 25.40 ACIS-I Nov 27
SU AUR ACIS-S/HETG
Radiation Belts Nov 28
SDSS 1306+0356 JET ACIS-S Nov 29
------------------------------------------
All spacecraft subsystems continued to support nominal operations.

Return to 2003 Status Reports


separator line
CXC Home | Search | Help | Site Map | Image Use Policy | Privacy & Accessibility | Downloads & Plugins
Latest Images | New & Noteworthy | Multimedia | Flash Ecards | Glossary | Q&A | Guestbook


RSS Feed RSS Feed | Podcast Podcast | Blog Blog

[News by email: Chandra Digest]
[Press Email cxcpress@cfa.harvard.edu]
[Public Email: cxcpub@cfa.harvard.edu]
NASA's Home Page Smithsonian's Home Page CXC Home Page Image Map for NASA's, Smithsonian and Chandra's Home Pages
Harvard-Smithsonian Center for Astrophysics
60 Garden Street, Cambridge, MA 02138 USA
Phone: 617.496.7941 Fax: 617.495.7356


Text Size:
normal font large font larger font
Chandra X-ray Center, Operated for NASA by the Smithsonian Astrophysical Observatory
This site was developed with funding from NASA under Contract NAS8-03060.
Revised: August 29, 2006