Operations CXO Status Report
Friday 22 Aug 2003, 1.00pm EDT
During the last week Chandra completed the observing schedule as
planned.
A realtime procedure was completed on 18 Aug to recover data from
SSR-A after it became full and recording autonomously switched to
SSR-B. SSR-A filled following problems with a DSN pass and was
unloaded during a rescheduled pass. A small data loss was incurred and
recording was switched back to the A-side on Aug 19.
Of note last week was the shipping of the Avionics and Software
Validation Test Set (ASVT) from NGST Space Park to the OCC in
Cambridge. The equipment will arrive 25 Aug and be fully checked out
prior to resuming operational use. The ASVT has been operated remotely
by the Flight Operations Team since launch.
The observing schedule for next week is shown below and includes
TOO followup observations of XTE J1810-197 and Eta Car.
|
------------------------------------------
Radiation Belts Aug 25
SDSS J020845.53+002236 ACIS-S Aug 25
F01572+0009 ACIS-S Aug 26
SDSS J233853.83+004812 ACIS-S Aug 26
HD 220657 ACIS-S/HETG Aug 26
NGC4750 ACIS-S Aug 27
NGC 5204 X-1 ACIS-S Aug 27
F15250+3609 ACIS-S Aug 27
XTE J1810-197 HRC-I Aug 27
Radiation Belts Aug 27
Eta Car ACIS-S Aug 28
A1763 ACIS-I Aug 28
VW CEP ACIS-S/HETG Aug 29
Radiation Belts Aug 30
3C296 ACIS-S Aug 31
Sagittarius DSPH ACIS-I Aug 31
------------------------------------------
All spacecraft subsystems, with the exception of the MUPS thruster A-1
under investigation, continued to operate nominally.
Return to 2003 Status Reports |