Operations CXO Status Report
Friday 11 July 2003, 11.00am EDT
During the last week Chandra completed the observing schedule as
planned.
The IRU-1 gyro-1 current remained quiet and near 150 mA during the
last week. The plan for swapping to IRU-2 on Jul 19 remains on
schedule.
The targets recommended for acceptance from the Cycle-5 Peer review
were posted on July 11. For details see:
http://cxc.harvard.edu/target_lists/index.html
A Chandra image release of the active galaxy NGC 1068 was made on July 9.
This composite X-ray and optical image shows gas blowing away in a
high-speed wind from the vicinity of a central supermassive black
hole. For details see:
http://chandra.harvard.edu/photo/2003/ngc1068/index.html
The observing schedule for next week is shown below and includes an
observation of 1150+495 coordinated with the Hubble Space Telescope.
|
------------------------------------------
Radiation Belts Jul 14
Markarian 1066 ACIS-S
Markarian 290 ACIS-S/HETG
PSR J1913+1011 ACIS-S Jul 15
Markarian 290 ACIS-S/HETG
Radiation Belts Jul 16
Markarian 290 ACIS-S/HETG Jul 17
1150+495 ACIS-S
V4743 Sgr HRC-S/LETG Jul 18
CLUS 214228-442029 ACIS-S
------------------------------------------
All spacecraft subsystems, with the exception of the MUPS thruster A-1
under investigation, continued to operate nominally.