Operations CXO Status Report
Friday 7 March 2003, 11.00am EST
During the last week Chandra completed the observing schedule as
planned.
Of note last week was the approval by the Flight Director Board of the
transition to DSS-24 following its upgrade to DSN's next generation
NSP (Network Simplfication Project) equipment. Following an initial
problem identifed during testing, the system is now ready to support
Chandra.
The Chandra Cycle 5 proposal deadline is March 14 at 7pm EST.
The observing schedule for next week is shown below.
|
------------------------------------------
Radiation Belts Mar 9
M87 ACIS-S
NGC4527 ACIS-S
NGC4418 ACIS-S
RX J151942.8-375255 ACIS-S Mar 10
XTE J1807-294 HRC-S
BR 2213-6729 ACIS-S
A514 ACIS-I
IIIZW54 ACIS-I
RX J062740.3+073103 ACIS-S Mar 11
LNS 6 ACIS-S
TXS 0726+499 ACIS-S
CEP B ACIS-I
Radiation Belts
IC 10 ACIS-S Mar 12
GEV J2035+4214 ACIS-I
IRAS 20126+4104 ACIS-I
CTB 80 HRC-S Mar 13
PSS 1506+5220 ACIS-S Mar 14
Radiation Belts
NGC 1265 ACIS-S
TXS 0756+303 ACIS-S Mar 16
PC 1035+4747 ACIS-S
BD1137+3000 ACIS-S
NGC4013 ACIS-S
2MASS104943+583750 ACIS-S
------------------------------------------
All spacecraft subsystems, with the exception of MUPS thruster A-1 as
noted above, continued to operate nominally.