Operations CXO Status Report
Friday 14 February 2003, 8.30am EST
During the last week Chandra completed the observing schedule as
planned.
Chandra passed through the seventh and eighth eclipses of the Spring
2003 season on 8 and 11 of Feb with nominal power and thermal
performance. Real-time procedures were run following each eclipse to
disable the Momentum Unload subfunction in the flight software to
ensure momentum dumps remain under manual control. A procedure to
clear a glitch counter that incremented during eclipse exit was also
run on 11 Feb.
A real-time procedure was completed on Feb 12 to update the on-board
ephemeris.
The observing schedule for next week is shown below and includes a
series of Calibration observations of AR Lac with the HRC.
|
------------------------------------------
SDSS J104230.14+010223 ACIS-S Feb 17
NGC 4361 ACIS-S
HS 1251+2636 ACIS-S
GEV J1825-1310 ACIS-I
MACHO-96-BLG-5 ACIS-S
SGR 1900+14 ACIS-S
RX J1914.4+2456 ACIS-S Feb 18
Radiation Belts
RX J1914.4+2456 ACIS-S Feb 19
NGC 6888 ACIS-S
Markarian 231 ACIS-S Feb 20
Radiation Belts Feb 21
ARLac (21 obs) HRC-S
ARLac (21 obs) HRC-I Feb 22
NGC 315 ACIS-S
87GB 0718+2748 ACIS-S Feb 23
MACSJ-0911.2+1746 ACIS-I
SDSS J015650.28+005308 ACIS-S
RX J2217.9-5941 ACIS-S
V838 Mon ACIS-S
------------------------------------------
All spacecraft subsystems, with the exception of MUPS thruster A-1 as
noted above, continued to operate nominally.