Operations CXO Status Report
Friday 7 February 2003, 8.00am EST
During the last week Chandra completed the observing schedule as
planned.
Chandra passed through the fourth, fifth and sixth eclipses of the
Spring 2003 season on 31 Jan, 3 and 5 of Feb with nominal power and
thermal performance. Real-time procedures were run following each
eclipse to disable the Momentum Unload subfunction in the flight
software to ensure momentum dumps remain under manual control.
The observing schedule for next week is shown below.
|
-------------------------------------------
F16090-0139 ACIS-S Feb 9
SN2003L ACIS-S
FIRST J114047+462204 ACIS-S Feb 10
2MASS104044+593409 ACIS-S
Radiation Belts
KS 1731-260 ACIS-S Feb 11
Markarian 231 ACIS-S
PSR J2021+3651 (2 obs) ACIS-S Feb 12
CYG X-3 HRC-I
NGC 660 ACIS-S
NGC1404 ACIS-S
Radiation Belts Feb 13
NGC 4772 ACIS-S
NGC4666 ACIS-S
NGC4636 (2 obs) ACIS-I Feb 14
NGC3125 ACIS-S Feb 15
Radiation Belts Feb 16
NGC2992 ACIS-S
------------------------------------------
All spacecraft subsystems, with the exception of MUPS thruster A-1 as
noted above, continued to operate nominally.