Operations CXO Status Report
Friday 6 December 2002, 9.00am EST
During the last week Chandra completed the observing schedule as
planned.
A calibration of the Aspect Camera Assembly's dark current was carried
via stored command loads on Dec 3. The calibration was monitored in
real-time and the data were captured successfully via dump through
virtual channel 2. The pass was also supported by a second DSN station
in shadow mode in order to test new Network Simplification Project
equipment. Data from the test is under analysis.
Of note last week was an article on Chandra in the December issue of
National Geographic. See pages 42-53 for some spectacular pictures,
including a fold-out.
The observing schedule for next week is shown below and includes an
observation of NGC7469 coordinated with the Hubble Space Telescope and
FUSE, and AB Doradus coordinated with ground-based observations.
|
-------------------------------------------
SDSS J165354+405402 ACIS-S Dec 8
NGC 4501 ACIS-S
2MASS124349-080248 ACIS-S Dec 9
Radiation Belts
GRB021201 ACIS-I
J 091824+063653 ACIS-S Dec 10
NGC 5171 ACIS-S
SN 2002HI ACIS-S
AB Doradus HRC-S/LETG
Radiation Belts Dec 11
NGC7469 ACIS-S/HETG Dec 12
UGC2369 ACIS-S Dec 14
BR 0424-2209 ACIS-S
Radiation Belts
MACS-J1311.0-0310 ACIS-I Dec 15
MACSJ1206.2-0847 ACIS-I
A697 ACIS-I
-------------------------------------------
All spacecraft subsystems continued to operate nominally.
Return to 2002 Status Reports |