Chandra X-ray Observatory - HomeAbout The ChandraEducational MaterialsField GuidePhoto AlbumPress RoomResources
Chandra X-ray Observatory - HomeChandra Press Room - You are here
ObservatoryPress ReleasesPress Releases - by datePress Releases - by categoryPress KitsNews Release Guidelines & ContactsNasa TVOperations CXO Status ReportsPress AdvisoriesImage ReleasesBiographies & InterviewsPress Images
Web Site ToolsVisit the Chandra ChroniclesEmail NewsletterSite MapNew & NoteworthyImage Use PolicyQuestions & AnswersGlossaryDownload Guide

Operations CXO Status Report

Friday 5 April 2002, 8am EST

During the last week the loads were interrupted on 2 April due to an execution of the Science Instrument safing SCS 107. The SCS was executed by the OBC as a result of the EPHIN hardware fault flag being set. Analysis of both real-time and dump data showed no problems with the hardware and a procedure was run on 3 April to re-initialize the OBC EPHIN process and resume science. A similar event occurred last December and a software patch to increase two glitch counters was identified to reduce further spurious trips of SCS 107. The patch is expected to be tested and brought for approval for uplink next week. Observations of NGC 6397, BR1202-0725 and HD133880 were impacted and will be rescheduled in an upcoming schedule.

Of note last week was a Chandra image release of the Coma cluster of galaxies. The image shows a concentration of relatively cool gas around two of the larger galaxies that is sustained in a delicate energy balance. For details see: http://chandra.harvard.edu/photo/2002/0150/index.html

The observing schedule for the next week is shown below and includes an observation of GX 3+1 coordinated with RXTE.

-------------------------------------------
MSH 11-62              ACIS-S       Apr 7
AX J1325.8-3920        ACIS-S       Apr 8
HEN2-104               ACIS-S
GX 349+2               ACIS-S/HETG
GX 3+1                 ACIS-S/HETG  Apr 9
GK Per                 ACIS-S/HETG
Radiation Belts
RX J170930.2-263927    ACIS-S       Apr 10
RCS1417+5305           ACIS-I
NGC 4911               ACIS-I       Apr 11
SU Uma                 ACIS-S/HETG  Apr 12
Radiation Belts
SU Uma                 ACIS-S/HETG
Cyg X-1                ACIS-S/HETG  Apr 13 
4C 15.55 Field         ACIS-I
SDSS095151+594556      ACIS-S       Apr 14
PSS0955+5940           ACIS-S
FTM0738+2750           ACIS-S
Crab Nebula Halo       ACIS-I
-------------------------------------------
All spacecraft subsystems continued to operate nominally.

Return to 2002 Status Reports


separator line
CXC Home | Search | Help | Site Map | Image Use Policy | Privacy & Accessibility | Downloads & Plugins
Latest Images | New & Noteworthy | Multimedia | Flash Ecards | Glossary | Q&A | Guestbook


RSS Feed RSS Feed | Podcast Podcast | Blog Blog

[News by email: Chandra Digest]
[Press Email cxcpress@cfa.harvard.edu]
[Public Email: cxcpub@cfa.harvard.edu]
NASA's Home Page Smithsonian's Home Page CXC Home Page Image Map for NASA's, Smithsonian and Chandra's Home Pages
Harvard-Smithsonian Center for Astrophysics
60 Garden Street, Cambridge, MA 02138 USA
Phone: 617.496.7941 Fax: 617.495.7356


Text Size:
normal font large font larger font
Chandra X-ray Center, Operated for NASA by the Smithsonian Astrophysical Observatory
This site was developed with funding from NASA under Contract NAS8-03060.
Revised: