Operations CXO Status Report
Friday 2/15/02 7.00am EST
During the last week, Chandra completed the observing schedule as planned.
Chandra passed through eclipses 4, 5 and 6 of the 2002 Spring season on Feb 8, 11 and 13 with nominal power and thermal performance.
A routine real-time procedure was completed on Feb 11 to update the on-board the Ephemeris.
The observing schedule for next week is shown below and includes an observation of Sgr A* coordinated with the Very Large Array and the last in a series of long observations of the Hubble Deep Field North that total 2 million seconds.
|
-------------------------------------------
Radiation Belts Feb 18
Vega (5 obs) HRC-S Feb 19
Sgr A* ACIS-I
AX J0335.2-1505 ACIS-S
HD 37022 ACIS-S/HETG
XRF011130 ACIS-I Feb 20
MACSJ0404.6+1109 ACIS-I
0806+20 ACIS-S
Quest 0928-0213 ACIS-S
H094605 ACIS-I
H094633 ACIS-I
RX J0806-4123 ACIS-I
Radiation Belts Feb 21
HDF-N ACIS-I
VEGA ACIS-S Feb 23
VEGA HRC-I
Radiation Belts Feb 24
APM08279+5255 ACIS-S
-------------------------------------------
All spacecraft subsystems continued to operate nominally.
Return to 2002 Status Reports
|