Operations CXO Status Report
Friday 12/14/01 8.30am EST
During the last week, Chandra completed the observing schedule as planned.
A routine real-time procedure was completed on Dec 11 to update the on-board the Ephemeris.
Work is nearing completion on the 2-week mission schedule to cover the holiday period from Dec 24 to Jan 6, 2002.
Of note last week was the release of the CIAO 2.2.1 analysis software together with CALDB 2.10, and the release of a new web form for data search and retrieval. For details, see http://cxc.harvard.edu.
The schedule of observations for the coming week is shown below and includes highly time constrained observations of the targets PHL 1811 and GX 301-2.
|
-------------------------------------------
G093.3+6.9 ACIS-I Dec 16
Radiation Belts Dec 17
PHL 1811 ACIS-S
ARP 222 ACIS-S
0453-68.5 ACIS-S Dec 18
HD 93497 ACIS-S/HETG Dec 18
NGC 2110 ACIS-S/HETG Dec 19
Radiation Belts
NGC 2110 ACIS-S/HETG Dec 20
3C 120 ACIS-S/HETG Dec 21
NGC 2110 ACIS-S/HETG
Radiation Belts Dec 22
GX 301-2 ACIS-S/HETG Dec 23
-------------------------------------------
All spacecraft subsystems continued to operate nominally.