Operations CXO Status Report
Friday 9/21/01 10.30am EDT
During the last week, Chandra completed the observing
schedule as planned.
Preparations were completed for the second set of
9 ACIS calibration observations of the dark moon planned for September
22.
Other highlights last week included the conduct of
safe-mode recovery training simulation over 19-20 September, and the
completion of the Cycle-3 cost review on 20 September and submission
of results to NASA HQ for selection.
The schedule of observations for the coming week
is shown below and includes an observation of HD 93497 coordinated
with the Hubble Space Telescope.
|
-------------------------------------------
Radiation Belts Sep 23
HD 93497 ACIS-S/HETG Sep 24
V 1525+0958 ACIS-I Sep 25
SN 1998S ACIS-S
Radiation Belts Sep 26
NGC 628 ACIS-S
NGC 278 ACIS-S Sep 27
2MASSJ222202+1952 ACIS-I
2MASSJ222221+1959 ACIS-I
S106 Fir ACIS-I
AX J1844-02 HRC-I Sep 28
Radiation Belts
SN1998BW ACIS-S Sep 29
SGR 1627-41 ACIS-S Sep 30
-------------------------------------------
All spacecraft subsystems continued to operate nominally.