Operations CXO Status Report
Friday 9/14/01 10.00am EDT
During the last week, Chandra completed the observing schedule as planned.
A real-time procedure was completed on Sep 12 to update the on-board ephemeris.
The schedule of observations for the coming week is shown below and includes a series of 9 calibration observations of the dark moon and 4 observations of the Comet 19P/Borrelly. The observation of EV Lac is coordinated with the Hubble Space Telescope and the Very Large Array.
|
-------------------------------------------
RX J0852.0-4622 ACIS-S Sep 16
Tau Ceti ACIS-S Sep 17
PSS 0059+0003 ACIS-S
BRI 0103+0032 ACIS-S
3C120 ACIS-S Sep 18
Radiation Belts
NGC3147 ACIS-S
WZ SGE ACIS-S
CAS-A HRC-S Sep 19
EV Lac ACIS-S/HETG
Radiation Belts Sep 20
1WGA_J1233.3+6910 ACIS-S Sep 21
MWC297 ACIS-I
SAX J1752.3-3138 ACIS-S Sep 22
Dark Moon (9 obs) ACIS-I
Comet 19P/Borrelly (4) ACIS-S
Puppis N Knot ACIS-S Sep 23
1RXS J1708-4009 HRC-I
All spacecraft subsystems continued to operate nominally.
Return to 2001 Status Reports
|