Operations CXO Status Report
Friday 7/27/01 11.30am EDT
During the last week the observing schedule was replanned to include two observations of the dwarf nova WZ Sge that was accepted as a Target Of Opportunity (TOO) on 24 July following its detection in outburst. The observation of 3C 334 was impacted and will be rescheduled in a future load.
The first insertion and retraction of the LETG using the new OTG software patch was monitored in real-time on July 25 and seen to complete nominally. All grating operations will now be conducted using the new patch. The observations of the dark moon were also monitored on July 25 and were completed as expected.
The replanned schedule with the observations of WZ Sge and the observations for the coming week shown below.
|
-------------------------------------------
WZ Sge (TOO) HRC-S/LETG Jul 26
G21.5-09 HRC-S Jul 27
Radiation Belts
M32 ACIS-S
Cygnus Loop ACIS-S Jul 28
NGC 6240 ACIS-S Jul 29
WZ Sge (TOO) ACIS-S
DQ Herculis ACIS-S
2MASSJ125807+2329 ACIS-I
2MASSJ130005+1632 ACIS-I
Radiation Belts Jul 30
M 16 ACIS-I
KES 79 ACIS-I Jul 31
NGC 4621 ACIS-S
Cir X-1 ACIS-S/HETG Aug 1
CI AQL ACIS-S
Radiation Belts
PKS 2153-69 ACIS-S Aug 2
2S0921-630 ACIS-S/HETG
BRI 0401-1711 ACIS-S Aug 3
2MASSJ022150+1327 ACIS-I
M15 HRC-I
LBQS 2201-1834 ACIS-S
A262 ACIS-S
RGH80 ACIS-I Aug 4
Radiation Belts
GRS 1915+105 ACIS-S/HETG
NGC 4494 ACIS-S Aug 5
Cir X-1 ACIS-S/HETG
V 1221+4918 ACIS-I
-------------------------------------------
All spacecraft subsystems continued to operate nominally.
Return to 2001 Status Reports
|