Operations CXO Status Report
Friday 5/25/01 11.00am EDT
During the last week, Chandra completed the observing schedule as planned.
A real-time procedure was conducted on 22 May to collect raw-mode data from the ACIS S0 chip without running in squeegee mode. The procedure was run as part of an investigation into using pre-cursor events to mitigate CTI degradation on-orbit. A series of further related tests will be run from the daily-load over the next 2-3 months.
Of note this week was the approval for operations of a new version of the Off-Line System (OFLS) ground software. The new version (9.1B) provides a number of improvements and bug fixes including an increased optimization of the scheduling algorithm and a better calculation for Earth avoidance during slews. The new software is scheduled to begin operational use on May 29.
The planned observations for the coming week are shown below.
|
-------------------------------------------
NGC 4258 ACIS-S May 28
ARP 242 ACIS-S May 29
NGC 4382 (M85) ACIS-S
LBQS 1212+1445 ACIS-S
LBQS 1029-0125 ACIS-S
LBQS 1442-0011 ACIS-S May 30
Radiation Belts
3C281 ACIS-S
NGC4594 ACIS-S
AGX J103244-1424 ACIS-I May 31
M 67 ACIS-I
Abell 1204 ACIS-I
MACS J1149.5+2223 ACIS-I Jun 1
MACS J1423.8+2404 ACIS-I
2MASSJ145331+1353 ACIS-I
CI AQL ACIS-S
NGC266 ACIS-S
Radiation Belt
3C 275.1 ACIS-S Jun 2
NGC 4365 ACIS-S
NGC 3585 ACIS-S Jun 3
3C 228 ACIS-S
-------------------------------------------
All spacecraft subsystems continued to operate nominally.