Operations CXO Status Report
Friday 3/23/01 4.00pm EST
During the last week, Chandra completed the observing schedule as planned.
Real-time procedures were completed nominally on March 18 to insert the LETG and on March 24 to retract the LETG. Testing of the flight software patch to allow a return to autonomous control of both the LETG and HETG underwent the final stages of testing at the OCC and TRW this week. On-orbit testing is scheduled for the first week in April, following board approval.
The planned observations for the coming week are shown below and include a coordinated observation of NGC 3783 with the Hubble Space Telescope.
|
------------------------------------------
A644 ACIS-I Mar 25
SDSSJ112956-014212 ACIS-S Mar 26
1WGA_J0951.4+3916 ACIS-S
3C254 ACIS-S
NGC4143 ACIS-S
SDSSJ153259-003944 ACIS-S
KS 1731-260 ACIS-S
CH Cyg ACIS-S/HETG Mar 27
Radiation Belt
4U 1636-53 ACIS-S/HETG
PKS2155-304 ACIS-S/HETG
ER_Vul ACIS-S/HETG
Radiation Belt Mar 30
NGC 3783 ACIS-S/HETG
Radiation Belt Apr 1
------------------------------------------
All spacecraft subsystems continued to operate nominally.
Return to 2001 Status Reports
|