|
|
Operations CXO Status Report
Friday 3/2/01 11.30am EST
During the last week, Chandra completed the observing schedule as
planned.
Chandra passed through eclipses 4 and 5 of the 2001 Spring season with
nominal power and thermal performance.
Real-time procedures were completed during last week to perform the
ACA Dark Current Calibration and to check the value of the CPE
warm-start count (remained at 1).
The planned observations for the coming week are shown below and
include an observation of NGC 3783 coordinated with the Hubble Space
Telescope, FUSE, RXTE, and ground based observations. The coordinated
portion of the observation will occur between 4.30am and 4.30pm on
March 11.
|
------------------------------------------
HDF-N ACIS-I Mar 4
GRB010222 ACIS-S Mar 5
Coma HRC-I
NGC2516 HRC-I
SN 1999EM ACIS-S
M31 ACIS-S Mar 6
Radiation Belt
NGC 3079 ACIS-S Mar 7
0802+103 ACIS-S
NGC 3077 ACIS-S
M31 ACIS-S Mar 8
1642+690 ACIS-S
G21.5-09 ACIS-I
G21.5-09 HRC-I
G21.5-09 HRC-S
RXJ1242-1119 ACIS-S Mar 9
Radiation Belt
NGC 3783 ACIS-S/HETG Mar 9
Radiation Belt Mar 11
-------------------------------------------
All spacecraft subsystems continued to operate nominally.
Return to 2001 Status Reports
|