Operations CXO Status Report
Friday 2/9/01 3.00pm EST
During the last week, Chandra completed the observing schedule as planned.
Real-time procedures were completed on 2/5/01 to re-dump SSR-B to investigate a data anomaly recorded on SSR-B, on 2/6/01 to backout the SSR-B patch and power down the recorder, and on 2/8/01 to uplink the short eclipse patch in preparation for the first eclipse on 2/11/01. In addition, routine procedures were completed to check the CPE warm-start count (remained at 1) and perform an Ephemeris update.
The planned observations for the coming week are shown below and will incorporate a real-time pass on 14 Feb to insert the LETG and on 17 Feb to perform the retraction. The schedule also includes a 35 Ks coordinated observation of UX Ari with XMM using the HRC and LETG.
|
-------------------------------------------
1040+123 ACIS-S Feb 12
NGC3379 ACIS-S
2MASSJ105144+3539 ACIS-I Feb 13
Radiation Belts
3EG J2227+6122 ACIS-I Feb 14
Capella HRC-S/LETG
UX Ari HRC-S/LETG
Radiation Belts Feb 16
NGC 4593 HRC-S/LETG
HD 206267 ACIS-S/HETG Feb 18
M31 Nucleus ACIS-I
2MASSJ091848+2117 ACIS-I
-------------------------------------------
All spacecraft subsystems continued to operate nominally.