Operations CXO Status Report
Friday 2/2/01 8.30am EST
During the last week, Chandra completed the observing schedule as planned.
A software patch was prepared and uplinked to the spacecraft on 2/1/01 to recover data from the Solid State Recorder following a missed pass and procedural problem. The potential for data loss was recognized immediately on 1/30/01 and recording swapped from SSR-B to SSR-A. The patch to modify the values of the SSR-B pointers allowed recovery of all data from the recorder without loss or operational impact.
The planned observations for the coming week are shown below and will incorporate a real-time pass on 8 Feb to uplink the short eclipse patch in support of the start of the Spring 2001 eclipse season on 11 Feb.
|
-------------------------------------------
Vela X-1 ACIS-S/HETG Feb 5
Radiation Belts
NGC 4051 ACIS-S Feb 6
A2256 ACIS-S
B2 0326+39 ACIS-S
IC 1727 ACIS-S Feb 7
Lambda Orionis ACIS-I
Vela X-1 ACIS-S/HETG
Iota Orionis ACIS-S/HETG
Radiation Belts Feb 8
Iota Orionis ACIS-S/HETG
HD 206267 ACIS-S/HETG
H 1821+643 ACIS-S/HETG Feb 9
OAO 1657-415 ACIS-S/HETG Feb 10
Radiation Belts
Capella ACIS-S/HETG Feb 11
Vela X-1 ACIS-S/HETG
-------------------------------------------
All spacecraft subsystems continued to operate nominally.