Operations CXO Status Report

Friday 12/1/00 10.30am EST

Last week the observing schedule was interrupted following a high radiation event at 2:46pm EST on Nov 26 that stopped the daily load and activated the science instrument safing sequence (SCS 107). All actions were nominal and assessment of the dump data confirmed that the trigger was due to high proton counts in the EPHIN P4GM channel exceeding the pre-defined threshold of 300 counts/cm^2/s/sr. The solar levels subsided to an acceptable level over the next 36 hours and the loads were replanned and resumed at 5am EST on 28 Nov. The observations of K284, M31, N103B were impacted and will be rescheduled in a future load.

Real-time procedures were completed during last week to re-enable SCS 107 and radmon on 26 Nov in preparation for load re-start, perform an ACIS CTI measurement on 26 Nov, perform a dump of the ACA software patch table on 28 Nov to verify operation of the ACA fid light software patch, and to reinitialize the OFP thruster command processing subfunction following a counter roll-over. All procedures were completed nominally.

The planned observations for the coming week are as follows and real-time procedures will be conducted to insert and retract the LETG on Dec 5 and 7 respectively.

-------------------------------------------
NGC 1068                ACIS-S/HETG  Dec 4  
NGC 1068                ACIS-S/LETG  Dec 5  
PKS2155-304             ACIS-S/LETG  Dec 6  
Radiation Belt
PKS2155-304             ACIS-S/LETG  Dec 7  
AGX J035048-1147        ACIS-I
SNR 1987A               ACIS-S
3C129                   ACIS-S       Dec 8  
Radiation Belt                       Dec 9  
1150+497                ACIS-S
E0102-72                ACIS-S       Dec 10 
-------------------------------------------
All spacecraft subsystems continued to operate nominally.

Return to 2000 Status Reports


separator line
CXC Home | Search | Help | Site Map | Image Use Policy | Privacy & Accessibility | Downloads & Plugins
Latest Images | New & Noteworthy | Multimedia | Flash Ecards | Glossary | Q&A | Guestbook


RSS Feed RSS Feed | Podcast Podcast | Blog Blog

[News by email: Chandra Digest]
[Press Email cxcpress@cfa.harvard.edu]
[Public Email: cxcpub@cfa.harvard.edu]
NASA's Home Page Smithsonian's Home Page CXC Home Page Image Map for NASA's, Smithsonian and Chandra's Home Pages
Harvard-Smithsonian Center for Astrophysics
60 Garden Street, Cambridge, MA 02138 USA
Phone: 617.496.7941 Fax: 617.495.7356


Text Size:
normal font large font larger font
Chandra X-ray Center, Operated for NASA by the Smithsonian Astrophysical Observatory
This site was developed with funding from NASA under Contract NAS8-39073.
Revised:



="/incl/footer.html"-->