Chandra X-ray Observatory - HomeAbout The ChandraEducational MaterialsField GuidePhoto AlbumPress RoomResources
Chandra X-ray Observatory - HomeChandra Press Room - You are here
ObservatoryPress ReleasesPress Releases - by datePress Releases - by categoryPress KitsNews Release Guidelines & ContactsNasa TVOperations CXO Status ReportsPress AdvisoriesImage ReleasesBiographies & InterviewsPress Images
Web Site ToolsVisit the Chandra ChroniclesEmail NewsletterSite MapNew & NoteworthyImage Use PolicyQuestions & AnswersGlossaryDownload Guide

Operations CXO Status Report

Friday 11/17/00 5.00pm EST

During last week the observing schedule was resumed on Nov 11 following the solar event of Nov 8. The schedule for the coming week was then re-planned to include an observation of the X-ray transient Aql X-1 which was triggered as a Target Of Opportunity (TOO).

A real-time test with ACIS was conducted Nov 13 to demonstrate a more efficient approach to downlinking raw frame data. Assessment of the results indicate that the test was successful. The approach will be used in assessing further squeegee mode test data. Other real-time activities included uplink of a non-checksum software patch on Nov 16 to clear the eclipse counter that incremented during the lunar eclipse of Oct 27 and re-enable SCS 12, a routine ephemeris update, and a check of the CPE warm start count that showed the value remained at 1.

Preparations are complete for the 2000 Leonids meteor shower passage expected to peak for Chandra at ~12:45am EST on 18 November. The predicted Zenith Hourly Rate this year is ~700 compared with 3700 observed during the 1999 passage. In order to minimize possible exposure to particles, Chandra is scheduled to observe targets within 7 degrees of the anti-radiant for the duration of the peak.

The replanned schedule including the TOO and the observations for the coming week are as follows. The observation of PMN J1131+0455 was impacted by the TOO and will be rescheduled in an upcoming week.

-------------------------------------------
Aql X-1 (TOO)           HRC-S/LETG   Nov 18
Eta Car                 ACIS-S/HETG
NGC 3368                ACIS-S       Nov 20 
Radiation Belt
3C 66B                  ACIS-S
HDF North               ACIS-I       Nov 21 
Radiation Belt                       Nov 23 
HDF (Quick Look)        ACIS-I       Nov 24 
Cen X-3                 ACIS-I       Nov 25 
Crab Nebula             ACIS-S
Radiation Belt                       Nov 26 
KI 284                  ACIS-S
M31 Transient           ACIS-S
-------------------------------------------
All spacecraft subsystems continued to operate nominally.

Return to 2000 Status Reports


separator line
CXC Home | Search | Help | Site Map | Image Use Policy | Privacy & Accessibility | Downloads & Plugins
Latest Images | New & Noteworthy | Multimedia | Flash Ecards | Glossary | Q&A | Guestbook


RSS Feed RSS Feed | Podcast Podcast | Blog Blog

[News by email: Chandra Digest]
[Press Email cxcpress@cfa.harvard.edu]
[Public Email: cxcpub@cfa.harvard.edu]
NASA's Home Page Smithsonian's Home Page CXC Home Page Image Map for NASA's, Smithsonian and Chandra's Home Pages
Harvard-Smithsonian Center for Astrophysics
60 Garden Street, Cambridge, MA 02138 USA
Phone: 617.496.7941 Fax: 617.495.7356


Text Size:
normal font large font larger font
Chandra X-ray Center, Operated for NASA by the Smithsonian Astrophysical Observatory
This site was developed with funding from NASA under Contract NAS8-39073.
Revised:



e>