During the last week, Chandra completed the observing schedule as planned.
Real-time procedures were completed during the last week to re-insert the LETG following the completion of the target of opportunity GB000926 at 4.30pm EDT on 29 Sept, retract the LETG as planned at 12.30pm EDT on 2 October, and to perform a test to determine the relative positions of the LETG bumper and retract limit switch. The bumper test was conducted at 12.30pm EDT on 4 October and the test data are being analyzed.
An unexpected Solid State Recorder (SSR) event occurred at 12:14pm on 29 Sept when recording switched from SSR-A to SSR-B without a commanded action. The switch occurred coincident with a commanded play-back from SSR-A and a fault tree analysis is under development. Following the switch, recording was continued on SSR-A, all data was recovered and all subsequent recording and playbacks have been nominal.
|
The planned observations for the coming week are as follows.
-------------------------------------------
GRB000926 ACIS-S Oct 8
Radiation Belt Oct 9
GRO J0422+32 ACIS-I Oct 10
A520 ACIS-I
B2 0738+313 ACIS-S
Abell 963 ACIS-S
3C 219 ACIS-S Oct 11
APM08279+5255 ACIS-S
NGC 507 ACIS-S
M31 (multiple) HRC-I
Radiation Belt Oct 12
NGC 720 ACIS-S
A521 ACIS-S Oct 13
SMC X-1 ACIS-S
A133 ACIS-S
HE0230-2130 ACIS-S Oct 14
RX J0925.7-4758 ACIS-S
SMC X-1 ACIS-S
NGC 7582 ACIS-S
Radiation Belt
NGC 7582 ACIS-S
G11.2-0.3 ACIS-S Oct 15
G29.7-0.3 ACIS-S
-------------------------------------------
All spacecraft subsystems continued to operate nominally.