Operations CXO Status Report

Friday 8/18/00 11:00am EDT


During the last week, Chandra completed the observing schedule as planned.

Real-time procedures were conducted during the week to perform the 8th ACIS Squeegee Mode test, retract the LETG, and perform a solar array off-point demonstration.

The Squeegee Mode Test was conducted at 6.30am EDT on Aug 12 and tested a new subarray mode. Initial analysis results indicate that the FWHM is comparable to the "maximum angular resolution" squeegee mode. This represents the last new mode test planned for the Squeegee runs.

The LETG retraction was performed at 6.30pm EDT on Aug 12 using a long move of 153 seconds followed by 9 short moves of 0.128 seconds duration. The total time was well within the range of expected times and telemetry indicated a nominal move.

The solar array off-pointing demonstration was conducted at 10.30pm EDT on Aug 14 using a combination of real-time and daily load commanding. The arrays were off-pointed by 75 degrees and then adjusted a further 1.5 degrees to ensure sufficient battery depth of discharge. The test proceeded as planned and the data collected from the demonstration will be used to determine the correct off-point angle for the lunar eclipse to occur in October. The solar array off-pointing will ensure that the spacecraft avoids a bus over-voltage condition at the completion of the eclipse.

The planned observations for the coming week are as follows:


-------------------------------------------
MCG-6-30-15             ACIS-S/HETG  Aug 21 
4U 1728-16              ACIS-S/HETG  Aug 22
4U 1700-37              ACIS-S/HETG 
Radiation Belt
4U 1822-37              ACIS-S/HETG  Aug 23
X2127+119               ACIS-S/HETG  Aug 24
SS CYGNI                ACIS-S/HETG
NGC 1275                ACIS-S/HETG
Q0836+7104              ACIS-S/HETG  Aug 25 
Radiation Belt
ABELL 1835              ACIS-S/HETG  Aug 26 
M31 Transient           ACIS-I       Aug 27 
0248+430                ACIS-S
Radiation Belt                       Aug 28 
 -------------------------------------------


All spacecraft subsystems continued to operate nominally.

Return to 2000 Status Reports


separator line
CXC Home | Search | Help | Site Map | Image Use Policy | Privacy & Accessibility | Downloads & Plugins
Latest Images | New & Noteworthy | Multimedia | Flash Ecards | Glossary | Q&A | Guestbook


RSS Feed RSS Feed | Podcast Podcast | Blog Blog

[News by email: Chandra Digest]
[Press Email cxcpress@cfa.harvard.edu]
[Public Email: cxcpub@cfa.harvard.edu]
NASA's Home Page Smithsonian's Home Page CXC Home Page Image Map for NASA's, Smithsonian and Chandra's Home Pages
Harvard-Smithsonian Center for Astrophysics
60 Garden Street, Cambridge, MA 02138 USA
Phone: 617.496.7941 Fax: 617.495.7356


Text Size:
normal font large font larger font
Chandra X-ray Center, Operated for NASA by the Smithsonian Astrophysical Observatory
This site was developed with funding from NASA under Contract NAS8-03060.
Revised: August 29, 2006